top of page

call Ben today 0402 784 711

EARTHWORKS

Reinstate drainage to stop pooling water and a top dress of the yard to level off and make mowing easy

Reinstate drainage to stop pooling water and a top dress of the yard to level off and make mowing easy

Reinstate drainage to stop pooling water and a top dress of the yard to level off and make mowing easy

Power trench for DLT Electrical

Power trench for DLT Electrical

Power trench for DLT Electrical

New temporary car park for a new estate entry

New temporary car park for a new estate entry

Yard transformation ready for turf

Yard transformation ready for turf

Yard transformation ready for turf

Yard transformation ready for turf

Weathered driveway reconstructed

Weathered driveway reconstructed

Topsoil prep to finish this place off nicely

Topsoil prep to finish this place off nicely

Topsoil prep to finish this place off nicely

Topsoil prep to finish this place off nicely

Topsoil prep to finish this place off nicely

Topsoil prep ready for a doggy day care

Topsoil prep ready for a doggy day care

Topsoil prep at the new Gatton basketball court

Topsoil prep at the new Gatton basketball court

Topsoil prep

Topsoil prep

Topsoil prep

Topsoil prep

Top dressing completed ready for summer for the perfect lawn

Top dressing completed ready for summer for the perfect lawn

40mm river rock supplied and spread to tidy the place up

Time for a fresh driveway

Time for a fresh driveway

Time for a fresh driveway

Tight access pool dig & backfill for owner builder

Tight access pool dig & backfill for owner builder

Tight access pool dig & backfill for owner builder

Tight access pool dig & backfill for owner builder

Subgrade prep and topsoil spread ready for turf

Subgrade prep and topsoil spread ready for turf

Subgrade prep and topsoil spread ready for turf

Subgrade prep and topsoil spread ready for turf

Sub soil drainage behind shed to prevent water under slab

Sub soil drainage behind shed to prevent water under slab

Sub soil drainage behind shed to prevent water under slab

Stripped grass, spread top soil, laid turf, spread road base for driveway up to shed

Stripped grass, spread top soil, laid turf, spread road base for driveway up to shed

Stripped grass, spread top soil, laid turf, spread road base for driveway up to shed

Stripped grass, spread top soil, laid turf, spread road base for driveway up to shed

Stripped grass, spread top soil, laid turf, spread road base for driveway up to shed

Stripped grass, spread top soil, laid turf, spread road base for driveway up to shed

Spread leftover pool fill cover with topsoil ready for turf

Spread leftover pool fill cover with topsoil ready for turf

Slashing grass & lantana

Slashing grass & lantana

Slashing

Slashing

Slashing

Slashing

Slashing

Slashing

Slashing

Slashing

Slashing

Slashing

Slashing

Slashing

Slashing

Slashing

Slashing

Slashing

Shed pad prep 100t of compactable fill supplied and spread

Shed pad prep 100t of compactable fill supplied and spread

Shed pad extension and water tank pad

Shed pad extension and water tank pad

Septic pump out pad to design for a new granny flat

Septic pump out pad to design for a new granny flat

Roadbase ramp access to new shed

Roadbase ramp access to new shed

Reshape front for ease of mowing

Reshape front for ease of mowing

Replacement of a collapsed pipe with 3 new concrete pipes

Replacement of a collapsed pipe with 3 new concrete pipes

Removed existing rocks from front yard and installed new sandstone blocks

Removed existing rocks from front yard and installed new sandstone blocks

Reinstated drainage along the boundary line ready for a new fence

Reinstated drainage along the boundary line ready for a new fence

Refreshed driveway and turn around pad

Refreshed driveway and turn around pad

Re-used boxed culverts on a farm for plant and machinery to cross

Re-used boxed culverts on a farm for plant and machinery to cross

New driveway roadbase ready for hand over

New driveway roadbase ready for hand over

Large excavator hired to push some large trees ready for a new shed pad, tree clean up, shed pad constructed and property slashed

Large excavator hired to push some large trees ready for a new shed pad, tree clean up, shed pad constructed and property slashed

Large excavator hired to push some large trees ready for a new shed pad, tree clean up, shed pad constructed and property slashed

Laidley golf course greens replacement and widening ready for new turf

Laidley golf course greens replacement and widening ready for new turf

Laidley golf course greens replacement and widening ready for new turf

Laidley golf course greens replacement and widening ready for new turf

Improved drainage installation of another water pipe to flow more water for access to the back paddock after rain

Improved drainage installation of another water pipe to flow more water for access to the back paddock after rain

Gardens removed and level parking pad for the new caravan

Gardens removed and level parking pad for the new caravan

Gardens removed and level parking pad for the new caravan

Garden bed constructed to divert storm water run off

Garden bed constructed to divert storm water run off

French drain (also known as subsoil drain) to catch storm water run off and ground water soaking above the house

French drain (also known as subsoil drain) to catch storm water run off and ground water soaking above the house

Fence line cleared and ready for mowing

Fence line cleared and ready for mowing

Driveway repairs after storm water damage, storm water pipe extension and new roadbase

Driveway repairs after storm water damage, storm water pipe extension and new roadbase

Access tracks cut for repeat customer

Top soil prep for BPM Property Management at rental property

Topsoil prep ready for a fresh lawn for the kids

9x9 shed pad prep

Top dressing to get rid of those lumps and bumps for ease of mowing

Small retaining wall and yard top dress

Slashing (6 acres)

Slab backfill and drainage ready for the new shed

Slashing (4 acres)

Shed slab extension prep and backfill

Shed pad prep

Shed pad with imported fill and compacted

Shed pad prep ready for concrete

Shed pad prep ready for concrete to be poured

Rock drain for storm water run off

Reshape batters for more usable play area & top dressing

Power trench to a granny flat

Power trench for repeat customer

A little tidy up of the car park - Laidley Golf Club

Post holes for the new tee box signs - Laidley Golf Club

New roadbase for repeat customer

Level pad cut and filled for shipping container and caravan parking

Concrete footing prep

Bunker reshape - Laidley Golf Club

Boundary line drainage

Backfill around shed ready for mowing profilings out front for vehicle access

Added parking space off driveway

Brought in a grader for this 1km long driveway, reinstated the drainage, shaped the driveway and some new gravel in select spots

Brought in a grader for this 1km long driveway, reinstated the drainage, shaped the driveway and some new gravel in select spots

New driveway constructed with drainage and new roadbase

New driveway constructed with drainage and new roadbase

Driveway subgrade shaped, drainage formed and covered in road profilings

Driveway subgrade shaped, drainage formed and covered in road profilings

Driveway subgrade shaped, drainage formed and covered in road profilings

Driveway subgrade shaped, drainage formed and covered in road profilings

Driveway subgrade shaped, drainage formed and covered in road profilings

Drainage around shed ready for a retaining wall

Drainage around shed ready for a retaining wall

Drainage, retaining wall dig out and the start of a shed pad prep

Drainage, retaining wall dig out and the start of a shed pad prep

Drainage, retaining wall dig out and the start of a shed pad prep

Drainage, retaining wall dig out and the start of a shed pad prep

More driveway completed with our rock subgrade and roadbase to cover the boggy ground, gardens mulched, crusher dust pathway and fire pit area

More driveway completed with our rock subgrade and roadbase to cover the boggy ground, gardens mulched, crusher dust pathway and fire pit area

More driveway completed with our rock subgrade and roadbase to cover the boggy ground, gardens mulched, crusher dust pathway and fire pit area

More driveway completed with our rock subgrade and roadbase to cover the boggy ground, gardens mulched, crusher dust pathway and fire pit area

Getting rid of a snake haven & allowing more sun for the solar

Getting rid of a snake haven & allowing more sun for the solar

Garden removal to make way for caravan storage and front yard garden removal ready for topsoil and turf to come

Garden removal to make way for caravan storage and front yard garden removal ready for topsoil and turf to come

Garden removal to make way for caravan storage and front yard garden removal ready for topsoil and turf to come

Fresh sandstone driveway from street to new shed for improved access for new caravan

Fresh sandstone driveway from street to new shed for improved access for new caravan

Fresh sandstone driveway from street to new shed for improved access for new caravan

Fresh sandstone driveway from street to new shed for improved access for new caravan

Fresh sandstone driveway from street to new shed for improved access for new caravan

Fresh sandstone driveway from street to new shed for improved access for new caravan

Fresh new driveway

Fresh new driveway

Fresh driveway gravel and repaired kerb outlet

Fresh driveway gravel and repaired kerb outlet

Fresh driveway gravel and repaired kerb outlet

Driveway prep ready for the concreters

Driveway prep ready for the concreters

Driveway lowered to drain water away from the house and out to the street, new road base supplied and spread and fill relocated to a future driveway to granny flat

Driveway lowered to drain water away from the house and out to the street, new road base supplied and spread and fill relocated to a future driveway to granny flat

Driveway extension in the boggy country of Coominya using 75-150 rock first then a layer of road base to elevate the driveway

Driveway extension in the boggy country of Coominya using 75-150 rock first then a layer of road base to elevate the driveway

Drainage to stop water from going in shed and redirect from house

Drainage to stop water from going in shed and redirect from house

Concrete prep for a new apron out the front of the shed

Concrete prep for a new apron out the front of the shed

Dam wall slashed - before

Dam wall slashed - After

Dam tidy up - Before

Dam tidy up - After

800sqm topsoil prep

800sqm topsoil prep

800sqm topsoil prep

800sqm topsoil prep

Batter repairs after a land slip

Batter repairs after a land slip

Batter repairs after a land slip

Batter repairs after a land slip

Batter repairs after a land slip

Before garden tidy up and turf

After garden tidy up and turf

  • Black Facebook Icon
bottom of page